Difference: ProjectCitadel2 (149 vs. 150)

Revision 1502019-05-07 - KavithaGurusamy

Line: 1 to 1
 
META TOPICPARENT name="ProductEnterprise"

Project Citadel

Line: 44 to 44
 
6.4.11.1
2019-March-16
Bug Fixes
  1. PIM and Add Employee Wizard - deprioritized defect fixes
  2. 0051591: Places which can break because of employee number is set to null when purging need to be identified and fixed

Patches
  1. Patch - Question deletion impact on appraisals
  2. Patch - Replace Google+ Authentication with Google
DONE
6.4.12
2019-Mar-31
Client Service Requirements
  1. Performance Module Audit Trail Enhancements - IV Twiki Ref
  2. PIM Reports - Salary Components as Separate Columns Twiki Ref
  3. Notifications for Cron Based Task Failures Twiki Ref
  4. LDAP API changes for Mobile
DONE
6.5
2019-Apr-30
Strategic Requirements
  1. CPM - Phase 1 (Dynamic Goals)
  2. CPM - Phase 1 (Goal Workflow)

Tactical Requirements
  1. LDAP API changes for Mobile
  2. Prevent goal deletion from affecting created appraisal
  3. Restrict no of vacancies through license

Key Bug Fixes

  1. Fix for timesheet crashing with date in 1969

DONE  
Changed:
<
<
6.5.1
2019-May-31
Strategic Requirements
  1. CPM - Identified Improvements - 1 Twiki Ref

Tactical Requirements
  1. Adding holiday should cancel the already applied leave
  2. Leave BF Expiry at the End of the Leave Period Twiki Ref
  3. Performance Appraisal multiple comments issue fix
  4. API to Get Enabled Modules
  5. Warning message needs to be shown when moving to another vacancy.

Work In Progress Requirements
  1. Report engine modification to cater the graphical support from backend Twiki Ref
  2. 9 Box Matrix - Phase 1 Twiki Ref
  3. Product upgrader changes to support VAS plugins as Turbo
Work in progress, under construction
>
>
6.5.1
2019-May-31
Strategic Requirements
  1. CPM - Identified Improvements - 1 Twiki Ref

Tactical Requirements
  1. Leave BF Expiry at the End of the Leave Period Twiki Ref
  2. Performance Appraisal multiple comments issue fix
  3. API to Get Enabled Modules

Work In Progress Requirements
  1. Report engine modification to cater the graphical support from backend Twiki Ref
  2. 9 Box Matrix - Phase 1 Twiki Ref
  3. Product upgrader changes to support VAS plugins as Turbo
Work in progress, under construction
 
META FILEATTACHMENT attachment="citadel-round.png" attr="" comment="" date="1501632941" name="citadel-round.png" path="citadel-round.png" size="270402" user="HimathDissanayake" version="1"
META FILEATTACHMENT attachment="cutmypic_11.png" attr="" comment="" date="1501635302" name="cutmypic_11.png" path="cutmypic_11.png" size="76022" user="HimathDissanayake" version="1"
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2022 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback